Southern HomeTellico Work Weekend Report

by Brad Headrick, SFWDA Tellico Representative

Date: October 17-19, 2003

Coordinator: Gunnar Byrd
Representative: Brad Headrick

Type of work performed:

  • Haul metal pipes.
  • Construct (weld) metal railings.
  • Install metal railings along roadways.
  • Clear out silt traps.
Volunteer Name SFWDA Club Representing
Travel Time
Work Time
Borum, David East Tennessee 4 Wheel Drive
2 hrs
10 hrs
Byrd, Gunnar Scenic City
12 hrs
16 hrs
Campbell, Scott Rattle Rock
4 hrs
22 hrs
Griffith, Adam SFWDA
4 hrs
10 hrs
Griffith, Kelsey SFWDA
4 hrs
10 hrs
Griffith, Greg SFWDA
4 hrs
10 hrs
Headrick, Brad Atomic City
4 hrs
10 hrs
Mayes, Lance Scenic City
8 hrs
16 hrs
McLeod, Sean Volunteer 4x4
4 hrs
16 hrs
Roller, Tommy Scenic City
8 hrs
16 hrs
Shirley, Allen Scenic City
4 hrs
16 hrs
Shirley, Griff Scenic City
4 hrs
16 hrs
Stroud, Roy Plum Crazzed
4 hrs
16 hrs
Young, DA Rattle Rock
4 hrs
22 hrs

Total Volunteers: 14

Total Travel Time: 106 hrs

Total Work Time: 190 hrs

 

Equipment Used Owner
Transport Time
Work Time
5-ton Dump truck SFWDA
N/A
10 hrs
Backhoe SFWDA
N/A
12 hrs
Skid Steer Shirley, Griff
4 hrs
10 hrs
Track Hoe Campbell, Scott
4 hrs
22 hrs
Portable Welder Roller, Tommy
8 hrs
16 hrs
1-ton Truck (Hauled Concrete) Byrd, Gunnar
12 hrs
10 hrs
Roller's Jeep (Hauled Welder) Roller, Tommy
8 hrs
16 hrs
DA's Jeep (Worker Hauler) Young, DA
4 hrs
22 hrs
Borum's Jeep (Worker Hauler) Borum, David
4 hrs
10 hrs
Mayes Jeep (Worker Hauler) Mayes, Lance
8 hrs
10 hrs
Griffth's Jeep ( Worker Hauler) Griffith, Greg
2 hrs
10 hrs
All terrain trailer SFWDA
N/A
10 hrs

Total Transport Time: 54 hrs

Total Work Hours: 148 hrs

 