Our Trail Ride schedule is now complete. We have something for everyone. Guided rides for Easy-Moderate to Advanced drivers as well as scenic excursion rides to some beautiful waterfall rich state parks. Full details are listed on our website, and online registration for each ride will be posted this week. If you're interested in joining a group of equally capable rigs to make the most of your weekend then stay tuned for the follow up post with online registration. Spaces are limited and are first come first served. See ya'll there.... In the meantime check out the complete line up here of rides here; http://www.sfwda.org/dr30-trail-rides/
Viewing entries tagged
Rock Solid
First picnic table completed and sign at the entrance. One more sign, two more tables, remove temporary bracing and general clean up and the area will be ready for use (not 100% but close). Target date to begin using will be September 1st, 2015.
Check out some submitted photos on the continuing progress of the Rock Solid Picnic Area Project inside of Windrock Park.










Photos provided by Bob Yarbrough
Rock Solid Jeep Club has constructed a perimeter fence up and erected the basic structure of the new pavilion inside of Windrock Park as part of an SFWDA Grant Project Award Recipient.